Woke r' Not
Critical Path poster

Critical Path

The engineering journey to Starship and beyond.

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Wokeness: Not yet rated

Overall Score: Not yet rated

Please Log in to Submit a Review!

Where to Watch

Trailers

Similar Movies

© 2022 Woke r' Not

Powered By

TMDB
Contact Us Link Tree Facebook Instagram Twitter